Fire trucks, stored at Hanger 17, Large Artifact storage faclity at JFK.Michael Shulan, Creative Director, and Jan Seidler Ramirez/ Chief Curator & Director of Collections, Nation September 11th Memorial and Museum, reviews photographs of victims that will be included in the Memorial.Jan Seidler Ramirez - Chief Curator and Director of Collections for the Memorial Musuem.Day of 9/12/11 - at the 9/11 Memortial PlazaJan Seidler Ramirez/ Chief Curator & Director of Collections, Nation September 11th Memorial and Museum, reviews photographs of victims that will be included in the Memorial.underground the WTC site, at the Museum construction site.1 Liberty Plaza.Installing the Trident, before construction begins on the Pavilion.President Obama at the WTC site, prepares to lay a wreath at the site.Water from the surrounding river is pumped out of the WTC ‘bathtub’ with this massive pumping station under ground zero.Hanger 17 - the Firetruck waits to be returned to the site.Alice Greenwald, Museum Director, stands on a piece of steel recovered from the WTC site.Alice Greenwald The Director of the World Trade Center Memorial Museum.Alice Greenwald The Director of the World Trade Center Memorial Museum tours the site with the head of the Holocaust Museum. Shot by Allison JoyceAlice Greenwald The Director of the World Trade Center Memorial Museum tours the site with the head of the Holocaust Museum. Shot by Allison JoyceTom Hennes of Thinc Design, one of the principal designers of the WTC Memorial Musuem.Michael Shulan, Creative Director, National September 11 Memorial & MuseumMichael Shulan, Creative Director, and Jan Seidler Ramirez/ Chief Curator & Director of Collections, Nation September 11th Memorial and Museum, reviews photographs of victims that will be included in the Memorial.The vehicle storage shed at Hanger 17, the site of large artifact restoration and storage for the National 9/11 Memorial and Museum.Hanger 17, bicycle rack recovered from the colapse of the World Trade Center, tagged to be returned to the Museum.Engineering reconstruction of the impact steel at the WTC - marking how the plane tore through the building facade.Museum planning begins.Fire trucks, stored at Hanger 17, Large Artifact storage faclity at JFK.KC Fabrications, Gardiner NY prepairs the bronze plates that will surround the WTC Memorial Pools. Names of the victims are incised in the plates.WTC